Note: The installation file for this application can be found here

In this article we will explain how the Catenda HUB database can be linked with PowerBI.​
By linking direct access to the data on Catenda HUB can be obtained in PowerBI. This data can then be used to evaluate tasks, documents or, for example, team members.

This article contains information about the following topics:

Installation

When the Catenda Desktop Connector is installed on Windows its installation files will appear in the following folder.

C:\Users\<Username>\Documents\Power BI Desktop\Custom connectors

Uninstalling

To uninstll the plugin go to the installation folder and run the following file:

uninstall.exe

If the folder has been deleted and the plugin is still active, please re-install the plugin and uninstall it with the uninstall file that has been created.

Get data and connect

To create a connection from PowerBI to the Catenda HUB database, proceed as follows:

Open PowerBI and click on "Get data from another source" in the middle of tthe screen or use the Get data action in the home menu of the top ribbon. The ribbon might have to be expanded to see the action.

Select the target source under Other --> Catenda.
Use "Connect" to establish the connection to the database.

Load data

A navigator opens in which all projects you have access to are listed.
Select the corresponding project and the table to be linked.
In our example we would like to evaluate topics in PowerBI.
Click on "Load" to load the dataset.

Here you will be able to choose from the following datasets:
Documents

Documents Label

Label

Member

Model

Model Revision

Products

Team

Team members

Token

Topic

Topic Board

Topic Label

Topic Status

Topic Type

After clicking on Load the PowerBI connector will start fetching the topic data from the API.

The data is then displayed it on the right-hand side.
Select the appropriate data field and create your analysis.

Tip: Load different data sets and link them together. With this you will be able to make interactive dashboards that give you a complete overview.

Depending on what data is present in your project and what data you load, different relations will be made automatically.

Table view

This is what the topic data can look like in table view:

Model view

Here is a map of what the connections look like in model view when all information is present in your project and you have loaded all project data:

Did this answer your question?